All at once
- One mobilization, one mess, one schedule
- Easier to coordinate trades and finishes
- Often less total disruption
- Needs the money and the willingness to move out or live in dust

Free written estimates
Whole-home restoration, remodeling, and improvement for lasting value.
Whether recovering from damage or upgrading your property, ABC Experts delivers house restoration and remodeling — bedrooms, living spaces, flooring, drywall, painting, and more.
Bedroom and living space remodels
Flooring, drywall, and painting
Demolition and reconstruction
Coordinated home improvement projects
Start with the size of the job
Renovation can mean anything from new paint and flooring to taking a house down to the studs. The size of the job decides who you need, how long you will live around it, and how many decisions you have to make. Pick the level that sounds closest to your plan.
Refresh
Paint, flooring, trim, light fixtures, and hardware. Walls, plumbing, and wiring stay where they are, so the project is mostly about finishes and schedule.
Decisions are mostly choices of color, material, and order of rooms.
The order of work
Each stage depends on the one before it. Tile cannot go in before the waterproofing, and paint should not start before the drywall dust is gone. Pick a stage on the schedule to see what happens and what we watch for.
Scope, layout, selections, and a written plan.
This is where most surprises are prevented. Clear drawings and a list of materials save time later.
Where to begin
1.Do you have drawings or a clear list of what you want?
2.Do you know which materials and fixtures you want?
3.Will walls, plumbing, or wiring move?
Your result
Answer all 3 questions
Pick one option for each question on the left and the result shows here.
Scope and schedule
No two projects are alike, and we do not quote from a table. These are the factors that change the work the most, shown with more filled dots for a bigger effect.
Living through it
Before
Move furniture, art, and valuables away from the work area. Anything left in the zone gets dusty, even with protection.
Demolition
Plastic barriers and floor protection reduce dust, but not to zero. Water or power may be off for short periods, and we tell you when.
Rough-in
Framing, plumbing, electrical, and heating crews may overlap. A shared schedule keeps them from tripping over each other.
Finishes
Dust drops off as drywall and paint go in, but fumes, smells, and the last small items can linger.
Closing out
We walk through with you, note the small items, and finish them before calling the job complete.
Tell us what you have in mind and we will walk the space with you.
Room by room
| Space | Typical work | Decisions you make |
|---|---|---|
| Kitchen | Cabinets, countertops, backsplash, flooring, appliances, lighting, plumbing and electrical updates | Layout, cabinet style, counter material, appliance sizes |
| Bathroom | Waterproofing, tile, fixtures, vanity, ventilation, plumbing updates | Shower or tub, tile type, accessibility, fixtures |
| Living areas | Flooring, trim, paint, lighting, sometimes opening or moving walls | Flooring material, open or closed layout, lighting plan |
| Bedrooms | Flooring, closets, paint, windows and doors | Closet systems, flooring, room size |
| Basement or attic | Moisture control, insulation, framing, drywall, stairs, egress | How the space will be used, ceiling height, heating and cooling |
| Exterior touches | Doors, windows, porches, decks, siding repairs | Materials that suit weather and maintenance |
What demolition reveals
Electrical
Older homes may have outdated wiring, too few circuits, or work that does not meet current code. Renovation is the right time to fix it.
A licensed electrician evaluates and updates what is needed for the new layout.
What we check
Contractor talk
Plan ahead
Ordering can take weeks, and countertops are templated after cabinets are installed.
Custom sizes and finishes come with long lead times, and openings may need framing changes.
Rough-in depends on the exact fixture, so selections have to be made before walls close.
Quantities, patterns, and layout affect cuts, waste, and how long installation takes.
Where lights, outlets, and switches go is easiest to change before drywall.
Colors look different in your light. Test samples on the wall before committing a whole room.
Before demolition day
Clear paperwork prevents most disagreements before they begin.
A common choice
Start with what you want to change and why, then walk the space with a contractor. A site visit turns ideas into a written scope, a schedule, and a list of decisions, which is far easier to price than a general wish list.
We look at the space, measure, talk through what you want, and write down a scope with materials and allowances. Estimates are free. If something changes after walls are opened, we explain it and agree on it in writing before continuing.
Many projects do, especially those involving structure, electrical, plumbing, or additions. Requirements vary by county and town. We tell you what applies to your project and handle permitting as part of the plan.
Often yes, especially when the work is limited to one area. Whole-home projects, heavy demolition, or work that shuts off water and power for long periods can make staying elsewhere more comfortable. We talk through it before the work starts.
It happens, especially in older homes. We stop, show you what we found, explain the options, and give you a written change order before doing extra work.
It depends on the size of the project, material lead times, permits, and what is found during demolition. We give you a written schedule and tell you early if anything shifts it.
Yes. After water, fire, or mold damage we can rebuild and, if you want, update the room while we are at it. See our guides to water damage restoration and fire damage restoration.
Yes. Kitchen and bathroom projects are common, and we handle plumbing, electrical, tile, cabinets, and finishes. See kitchen remodeling and bathroom remodeling.
A change order is a written agreement to add, remove, or change work, with the cost and schedule effect stated before the work is done. It protects both of us from surprises.
Make selections early, order long lead items right away, keep the work area clear, and decide quickly when questions come up. Most delays come from waiting on a decision or a delivery.
Yes. We lay protection on floors and paths, seal off work areas with plastic when needed, and clean up each day. Anything delicate or valuable is best moved out of the work zone ahead of time.
We look more carefully. Older homes can have lead paint, asbestos-containing materials, outdated wiring, or aging plumbing. We check, test where it makes sense, and plan around what we find.

Who is behind this page
Water, fire, and mold restoration plus remodeling for Charlotte-area homes and businesses, from emergency cleanup to the finished repair.
We answer calls 24 hours a day.
Fill in the form and we will get back to you.
Emergency? Call, 24/7(980) 282-9637Also from ABC Experts