Skip to main content
Kitchen Remodeling by ABC Experts in Charlotte, NC

Free written estimates

Kitchen RemodelingPlanned in writing, built under one roof

Kitchen renovations that blend function, craftsmanship, and lasting materials.

What you get

From cabinets and countertops to full kitchen renovations, we remodel with the same precision we bring to restoration — clean planning, dependable timelines, and quality finishes.

  • Cabinets and custom layouts

  • Tile and flooring upgrades

  • Full kitchen renovations

  • Restoration-to-remodel continuity

Start with the plan

A good kitchen starts with how you actually cook.

Before cabinets or colors, look at the path you walk when you make a meal. The fridge, sink, and range form a triangle, and the best layouts keep it comfortable without being crowded. Tap the numbers on the plan to see what each part of a good kitchen needs.

FRIDGESINKwalkway

The refrigerator

Food comes out here first, so it should be reachable without crossing the cooking area.

Put it at the end of a run of counters, with a landing spot beside it for groceries, and make sure the door can open fully.

Layout choices

Which shape fits your space?

Two parallel runs

Galley kitchens

Two parallel runs of cabinets with a walkway in between. Compact and efficient, with everything within a step or two.

We focus on storage and lighting so a narrow room does not feel tight.

Good to know

  • Great for narrow rooms
  • Limited room for seating
  • Traffic should not cut through

Cabinets

Stock, semi-custom, or custom?

Cabinets are usually the largest decision in a kitchen, both visually and in terms of lead time. Here is how the three tiers compare, without prices: the right one depends on the shape of your room and how particular you are.

TypeWhat it isFlexibilityGood for
StockReady-made boxes in standard sizes, available quicklyLimited sizes and finishesStandard rooms and tighter schedules
Semi-customStandard boxes with more sizes, finishes, and optionsModerate: many sizes and detailsMost remodels where some fit adjustment helps
CustomBuilt to your room and your designAlmost unlimitedUnusual rooms, specific storage needs, and particular style
FramedA face frame on the front of the boxTraditional look, slightly less interior roomClassic styles
FramelessNo face frame, doors cover the full boxModern look, more usable interiorContemporary kitchens

The order of work

How a kitchen remodel unfolds.

  1. Step 1

    Demolition and protection

    Old cabinets, counters, and flooring come out. Dust barriers go up and floors along the path are protected.

  2. Step 2

    Rough plumbing and electrical

    Lines and boxes are moved to match the new layout, while the walls are still open.

  3. Step 3

    Drywall, paint, and flooring

    Walls are repaired and painted, and flooring goes in before cabinets so it is not cut around them.

  4. Step 4

    Cabinets go in

    Boxes are set level and tied together, then doors and hardware are adjusted so everything lines up.

  5. Step 5

    Counters are measured and fitted

    Templates are made once cabinets are in, and countertops are cut, delivered, and set.

  6. Step 6

    Backsplash, fixtures, and finishes

    Tile, sink, faucet, lighting, appliances, and trim complete the room, followed by a walk-through.

Countertops

Surfaces compared on what matters day to day.

MaterialHolds up toUpkeepWatch for
QuartzDaily wear, stains, and scratchesLow: wipe with mild soapVery hot pans can damage the resin, so use trivets
GraniteHeat and everyday useNeeds periodic sealingUnsealed stone can stain, and seams show on large runs
Butcher blockCutting and prep, warm to the touchRegular oiling, and wet areas need careWater around sinks and deep scratches over time
LaminateEveryday use at a gentler costVery lowHeat and cuts mark the surface and are hard to repair
Solid surfaceDaily use, with seamless jointsLow, and scratches can be buffed outHot pans and heavy impact can mark it

Samples look different in your light and next to your cabinets. We suggest looking at full slabs or larger samples in the room before deciding.

Ready to plan your kitchen?

Tell us what you want to change and we will visit, measure, and write it up.

What is behind the beauty

Light, power, air, and water.

  • Layered lighting

    Ceiling light for the room, under-cabinet light for tasks, and accent light for mood. One fixture in the center is rarely enough.

  • Circuits and outlets

    Countertop outlets and large appliances have electrical requirements that may call for new circuits and a panel check.

  • Ventilation

    A hood that vents outside removes grease, steam, and smoke. A recirculating one only filters some of it.

  • Plumbing

    Moving the sink or dishwasher means new supply and drain lines, and sometimes work in the floor or wall below.

  • Flooring

    Choose a surface that handles spills and standing. Floors are laid before cabinets or planned around them.

  • Appliance clearances

    Doors, drawers, and ovens need room to open. We check each appliance's clearances against the plan.

Scope

How far do you want to go?

Refresh

Paint, hardware, and small updates

New paint, cabinet hardware, lighting, and maybe a new faucet. The layout and cabinets stay, so there is little disruption.

Fastest to complete, with the least mess.

Kitchen myths

Ideas that sound right but cause regrets.

Before you pick a date

Decisions to make before the work begins.

Settle these on paper

Kitchens move fast once they start, so the choices below are easiest to make before demolition.

  • Layout and the work triangleWhere the fridge, sink, range, island, and walkways go.
  • Cabinet type and finishStyle, framed or frameless, and lead times.
  • Counter material and edgeSample in the room, and confirm the support and sink cutouts.
  • Appliances and their clearancesModels and dimensions chosen before cabinets are ordered.
  • Lighting, outlets, and ventilationLocations marked so the electrician can rough them in correctly.
  • A temporary kitchen planA spot for the fridge, a microwave, and a sink for the weeks ahead.

Showroom words

A short kitchen glossary.

Base cabinet
A cabinet that sits on the floor and holds the countertop.
Wall cabinet
A cabinet mounted on the wall above the counter.
Toe kick
The recessed space at the bottom of base cabinets that lets you stand close to the counter.
Backsplash
The surface behind the counter that protects the wall from splashes.
Filler
A strip that closes small gaps between cabinets and walls for a clean fit.
Overhang
The part of a countertop that extends past the cabinet, often used for seating.
Soffit
The boxed-in area above wall cabinets, sometimes removed to gain height.
Rough-in
Plumbing and electrical lines installed inside the walls before they are closed.

The hard part

Living without a kitchen for a while.

The kitchen goes quiet first and the dust arrives second. A plan for meals makes the project feel shorter.
From our planning checklist
  • A temporary kitchen

    Set up a small table with a microwave, kettle, and toaster in another room.

  • A place to wash up

    Plan where dishes will be rinsed while the sink is out of service.

  • Storage for the basics

    Pack dishes and food you will need in boxes you can reach.

  • Dust control

    Seal doorways and vents, and expect some dust in nearby rooms anyway.

FAQ

Kitchen remodeling questions

Can't find your answer? We pick up day and night.

(980) 282-9637

Decide what is not working today, then walk the room with us. We measure, talk through layout and finishes, and write up a scope. Free estimates, and the plan is easier to price when the layout and big choices are settled.

Most people do. Plan a temporary kitchen, protect nearby rooms from dust, and expect the sink and stove to be out of service at times. We tell you when water or power will be off.

It varies by type and maker. Stock cabinets are usually available sooner, while semi-custom and custom ones can take weeks. We order as early as we can and schedule demolition around the delivery.

Often, when the work involves electrical, plumbing, gas, or removing walls. Requirements depend on your county or town, and we tell you what applies and handle it as part of the project.

Usually yes. It involves new plumbing, electrical, or gas lines and sometimes work under the floor. We check feasibility and cost before recommending it.

Often, but first we check whether the wall carries weight, and what is inside it. Load-bearing walls need a beam and sometimes an engineer, and a permit.

Stock cabinets come in standard sizes and are available quickly. Semi-custom offer more sizes and finishes. Custom cabinets are built to your room. The choice depends on your layout, schedule, and how particular you are.

It depends on how you use the kitchen. Quartz is low maintenance, granite is heat resistant and needs sealing, butcher block is warm but needs care around water. We help you compare using larger samples in your room.

Use layers: general light overhead, task light under cabinets, and accent light for mood. Where outlets and switches go is easiest to settle before the walls are closed.

Venting to the outside removes grease, moisture, and smoke from the house. Recirculating hoods filter some of it but do not remove moisture. We recommend outside venting where the layout allows.

Yes. If we find water damage, rot, or old wiring, we show you what we found, explain the options, and agree on a change order before doing extra work.

Yes. After water damage or fire damage, we can rebuild and, if you wish, redesign the kitchen at the same time so the end result is one you chose.

ABC Experts logo

Who is behind this page

ABC Experts LLC

Water, fire, and mold restoration plus remodeling for Charlotte-area homes and businesses, from emergency cleanup to the finished repair.

We answer calls 24 hours a day.

Request kitchen remodeling

Fill in the form and we will get back to you.

Emergency? Call, 24/7(980) 282-9637
  • Free estimates
  • Fast response, day and night
  • Insurance-friendly documentation
Call Now